How Much Should a Painter & Decorator Charge Per Day in the UK? (2026)
Working out your day rate as a self-employed painter and decorator — covering prep, materials, region, and how to quote without losing money on slow jobs.
By GraftLog
Painter and decorator day rates in the UK range wildly — £150 to £400+ per day in 2026. The wide range reflects the difference between someone who's guessing and someone who knows their costs. Here's how to make sure you're the second one.
The trap most decorators fall into
The classic mistake: charge £200/day because that's what others charge, then quietly subsidise jobs with cheap materials, skip prep, or work evenings to "make it work."
The right way is to work your rate out from your costs and what you want to earn. Same approach as electricians — different numbers.
Your real costs
A self-employed painter and decorator typically has £12,000–£22,000/year in non-wage costs:
- Van and fuel
- Paint, brushes, rollers, sandpaper, fillers, dust sheets
- Public liability insurance
- Accountancy
- Software
- Workwear (painters go through kit fast)
- Marketing
- Tax (treat your own tax as a cost)
Billable days per year
You don't bill 5 days a week. Realistically:
- 4–6 weeks holiday
- 1–2 weeks sick
- Bank holidays
- Rain days and weather stops (exterior work)
- Quote time, admin, materials runs
Most decorators bill 180–210 days a year.
The maths
Let's say £18,000 costs + £40,000 target profit = £58,000. ÷ 195 billable days = £297/day.
Round to a clean number: £300/day.
Regional variations
- London & South East: typically £280–£400/day
- Midlands, North, Wales: typically £200–£280/day
- Scotland, rural areas: typically £180–£250/day
These are for a single decorator. Add £80–£120/day per labourer if you bring help.
What's in your day rate
A day rate should cover:
- Your time on the tools
- Standard materials (brushes, rollers, fillers, tape, dust sheets)
- Wear and tear on tools
It should not cover:
- Paint and wallpaper (these are pass-through, mark them up 15–25%)
- Major prep (plastering, lining paper) — quote separately
- Specialist finishes (faux, metallic, textured) — quote by the wall or the room
Always quote paint as a separate line so the customer can see what they're paying for materials vs labour.
How to quote a room
A good quote for "paint living room" should look like:
| Item | Detail | Price |
|---|---|---|
| Walls — 2 coats emulsion | 22 m² | £XXX |
| Ceiling — 2 coats emulsion | 18 m² | £XX |
| Woodwork — primer + 2 coats | 3 doors, skirting, dado | £XX |
| Materials (paint, brushes, etc.) | At cost + 20% | £XX |
| Total | £XXX |
When the customer sees the breakdown, they understand why a room costs £400 and not £200. They can also see where they could cut costs (e.g. "just the walls, not the woodwork").
Slow jobs kill day rates
A £300/day rate only works if you actually bill close to a day. If a job takes you three days when you quoted for two, your effective rate just dropped to £200.
Two ways to protect yourself:
- Quote by the task, not the day. "Walls 2 coats: £X. Woodwork: £Y." Slow jobs cost you nothing extra.
- Build in a buffer. When estimating, assume the job will take 20% longer than you think. It usually will.
The bottom line
Work out your real costs, divide by your real billable days, and quote by the task. Don't compete on price — compete on a clear, professional quote that shows the customer exactly what they're paying for.
More from GraftLog
- MTD for Sole Traders: What's Changing in 2026 and How to Get ReadyMaking Tax Digital is rolling out to sole traders. Here's what it actually means, what you have to do, and the easiest way to stay compliant without paying an accountant £500 a year.
- How Much Should an Electrician Charge Per Hour in the UK? (2026)A practical guide to setting your hourly rate as a self-employed electrician — covering day rates, call-out fees, regional variations, and how to quote so you don't leave money on the table.
- How to Write a Quote for Building Work (Free Template, 2026)A clear quote wins work and protects you from scope creep. Here's exactly what to include, the difference between a quote and an estimate, and a free template you can copy.