How to Write a Quote for Building Work (Free Template, 2026)
A clear quote wins work and protects you from scope creep. Here's exactly what to include, the difference between a quote and an estimate, and a free template you can copy.
By GraftLog
A good quote does three things at once:
- Wins the job — by being clear, professional, and easy to say yes to.
- Protects you — by setting out exactly what's included and what isn't.
- Gets you paid — by making the payment terms obvious upfront.
A bad quote does the opposite: vague scope, no terms, no deadline, and you spend the next three months arguing about whether the second coat of paint was included.
Quote vs estimate — what's the difference?
A quote is a fixed price. Once you give it, the customer can hold you to it (and you can hold them to paying it). An estimate is your best guess — useful for early conversations but not legally binding.
Always give a quote once you've seen the job. Never say "it'll be about £X" and walk away — that becomes your quote in the customer's mind.
What every quote needs
1. Your business details
- Trading name and any Ltd company details
- Address and phone number
- VAT number (if registered)
- Trade body or certification numbers (NICEIC, Gas Safe, FMB, etc.)
2. Customer details
- Name and address
- Site address if different
3. Job description
A line-by-line breakdown of:
- What you're doing
- What materials you're using
- How long each part will take (or quantities if priced by unit)
Bad: "Painting living room — £400." Good: "Living room walls — 2 coats emulsion, 22m² — £220. Ceiling — 2 coats emulsion, 18m² — £80. Woodwork — primer + 2 coats satin, 3 doors + skirting — £160. Materials (paint, brushes, fillers, dust sheets) at cost + 20% — £80. Total: £540."
4. Price
- Subtotal
- VAT (if registered, show the rate)
- Grand total — clearly highlighted
5. What's NOT included
This is the section that prevents arguments. Spell out anything the customer might assume is included but isn't:
- Making good plaster or rendering
- Decoration after the work
- Moving furniture
- Skips or waste removal
- Permits or council fees
6. Timeline
- Start date (or "within X weeks of acceptance")
- Estimated duration
- Working hours (so the neighbour doesn't complain)
7. Payment terms
- Deposit (typically 25–50% on acceptance for trades)
- Stage payments for bigger jobs
- Final balance on completion
- Payment method (bank transfer, card, cheque)
- Late payment terms
8. Validity
- "This quote is valid for 30 days from the date above."
This lets you raise prices later without feeling bad.
9. Acceptance
- A line for the customer to sign
- "I accept this quote and agree to the payment terms above."
The free template
Here's the structure you can copy into a doc right now:
[Your business name]
[Address, phone, email]
[Trade body number, VAT number if applicable]
QUOTE
Quote number: Q-2026-XXX
Date: [today]
Valid until: [today + 30 days]
To: [Customer name]
Site: [Address]
Description of work
─────────────────────────────────────
1. [Task] — [quantity / hours] — £XXX
2. [Task] — [quantity / hours] — £XXX
3. [Task] — [quantity / hours] — £XXX
Subtotal: £XXX
VAT (20%): £XXX
Total: £XXX
What's not included
─────────────────────────────────────
• [List anything excluded]
Payment terms
─────────────────────────────────────
• 30% deposit on acceptance (£XXX)
• Balance on completion (£XXX)
• Bank transfer to [account details]
Validity: This quote is valid for 30 days.
Signed: ___________________ Date: ___________
[Customer name]
Common mistakes to avoid
- Don't quote from a description alone. Visit the job, take photos, measure. A "quote" based on a phone call isn't a quote.
- Don't bury the price. Show it clearly. Customers want to know the number fast.
- Don't use vague language. "Some prep" or "as required" is asking for a dispute. Specify what's included.
- Don't forget the deposit. No deposit = no commitment. Get 25–50% upfront for any non-trivial job.
The bottom line
A quote is a sales tool disguised as a piece of paperwork. The clearer it is, the more likely you are to win the job AND get paid without arguments.
GraftLog's AI quote builder creates a professional PDF quote like this in about 60 seconds. Try it free for 14 days →
More from GraftLog
- MTD for Sole Traders: What's Changing in 2026 and How to Get ReadyMaking Tax Digital is rolling out to sole traders. Here's what it actually means, what you have to do, and the easiest way to stay compliant without paying an accountant £500 a year.
- How Much Should an Electrician Charge Per Hour in the UK? (2026)A practical guide to setting your hourly rate as a self-employed electrician — covering day rates, call-out fees, regional variations, and how to quote so you don't leave money on the table.
- How Much Should a Painter & Decorator Charge Per Day in the UK? (2026)Working out your day rate as a self-employed painter and decorator — covering prep, materials, region, and how to quote without losing money on slow jobs.